Home
Add to Favourites
Site Map
TAI'S VOICE
PRESS RELEASES
VIP VISITORS
PRESS BULLETINS
NEWS FROM TYGD
ARCHIVE
26 June 2008 -
FIRST A400M MILITARY TRANSPORTER ROLLED OUT
24 June 2008 -
THE CONTRACT OF THE ATAK PROGRAM BECOMES EFFECTIVE
04 April 2008 -
WITH THE TURBOPROP ENGINE, DEVELOPED BY TEI, TAI'S INDIGENOUS TARGET DRONE "TURNA" SUCCESSFULLY REALIZED ITS FIRST FLIGHT
15 February 2008 -
FIRST ATR72-500 AIRCRAFT UNDER MELTEM III PROGRAM ARRIVED AT TAI’S FACILITIES
27 December 2007 -
THE FIRST C-130 AIRCRAFT, THE AVIONICS MODERNIZATION OF WHICH WILL BE REALIZED BY TAI, ARRIVED AT TAI’S FACILITIES
10 December 2007 -
TAI, AUTHORIZED BY NORTHROP GRUMMAN TO BEGIN WORK ON FIRST PHASE OF F-35 LOW RATE INITIAL PRODUCTION
06 November 2007 -
AIRBUS INCREASES COOPERATION IN TURKEY THROUGH NEW CONTRACT WITH TAI
17 October 2007 -
TAI DELIVERS RJAF'S FIRST F-16 A/C MODERNIZED AT ITS FACILITIES
17 September 2007 -
THE CONTRACT FOR ATAK HELICOPTER PROGRAM IS SIGNED
13 September 2007 -
TAI & TEI UNITE POWER - LOCAL ENGINE FOR LOCAL AIRCRAFT
19 July 2007 -
BASIC TRAINER AIRCRAFT CONTRACT SIGNED BETWEEN TAI AND KAI
11 July 2007 -
F-16 PEACE ONYX III PROGRAM KICKS-OFF
07 July 2007 -
TAI’S IT DEPARTMENT RECEIVES CMMI LEVEL 3 CERTIFICATE
12 June 2007 -
TAI'S TURKISH PRIMARY AND BASIC TRAINER AIRCRAFT (HURKUS) TO BE DISPLAYED AT 47TH PARIS AIR SHOW
12 June 2007 -
THE TURKISH INDIGENOUS MALE UAV TO BE DISPLAYED AT THE 47TH PARIS AIR SHOW
20 May 2007 -
TAI PARTICIPATES IN IDEF 2007
05 April 2007 -
CHANGE IN OUR COMPANY NAME
07 February 2007 -
TAI GETS $ 3 BILLION F-35 LIGHTNING II WORK
12 January 2007 -
C-130 AVIONICS MODERNIZATION “ERCIYES PROGRAM” HAS STARTED
22 December 2006 -
TAI SHIPS THE FIRST AW139 HELICOPTER FUSELAGE
13 December 2006 -
CONCEPTUAL DESIGN OF TURKISH PRIMARY AND BASIC TRAINER AIRCRAFT 'HURKUS' WAS APPROVED
01 December 2006 -
TAI WILL REALIZE THE AVIONIC MODERNIZATION OF TUAF C130 AIRCRAFT
22 November 2006 -
DURING IDEAS 2006, AN MOU WAS SIGNED BETWEEN PAF AND TAI FOR THE MODERNIZATION OF F-16S
08 November 2006 -
TAI HAS DELIVERED THE FIRST A400M COMPOSITE AILERON AND SPOILER COMPONENTS THAT ARE DESIGNED AND MANUFACTURED BY THE COMPANY
03 November 2006 -
A400M FUSELAGE OUT OF JIG
19 October 2006 -
TAI BECOMES TURKEYS AIRCRAFT/SATELLITE ASSEMBLY, INTEGRATION AND TEST CENTER
02 October 2006 -
THE SECOND PEACE EAGLE B737 AEW&C AIRCRAFT ARRIVES AT TAI
14 July 2006 -
A SIGNIFICANT STEP TOWARDS THE DEVELOPMENT OF OUR AVIATION INDUSTRY AND INDUSTRIALIZATION
07 July 2006 -
TAI DISPACHES THE FIRST A400M FORWARD CENTER FUSELAGE COMPONENT TO BREMEN
24 April 2006 -
TAI’S NEW GENERATION RECOVERABLE AERIAL TARGET SYSTEM TURNA/G IN THE INVENYORY OF THE TURKISH ARMED FORCES
04 April 2006 -
TAI ACHIEVES SHIPMENT OF THE FIRST A400M COMPONENT TO BREMEN
13 March 2006 -
THE FIRST PEACE EAGLE B737 AEW&C AIRCRAFT ARRIVES AT TAI
06 December 2005 -
TAI WILL REFURBISH THE OUTER WING SECTION OF NATO-AWACS AIRCRAFT
25 November 2005 -
TAI REALIZES THE PRODUCTION OF FIRST COMPOSITE DETAIL PART UNDER THE A400M PROGRAM
29 September 2005 -
SSM AND TAI SIGN TWO PROTOCOLS DURING IDEF 2005
14 June 2005 -
TAI AWARDED F-35 JOINT STRIKE FIGHTER WORK BY NORTHROP GRUMMAN
03 June 2005 -
TAI PARTICIPATES IN PARIS AIR SHOW
12 May 2005 -
TAI REALIZES THE FIRST METAL CUT OF A400M
15 March 2005 -
A400M LIGHTING SYSTEM EQUIPMENT PROCUREMENT SUBCONTRACT WAS SIGNED BETWEEN TAI AND SELKOM
18 February 2005 -
TAI’S SUPPORT TO LOCAL SUB-TIER INDUSTRY DEVELOPMENT
13 January 2005 -
TAI IS A STANDALONE TURKISH AEROSPACE COMPANY
28 January 2004 -
UNDER "PEACE EAGLE" PROGRAM, STRUCTURAL MODIFICATION CONTRACT IS SIGNED BETWEEN TAI AND BOEING
©
Turkish Aerospace
Industries, Inc.
Company Profile
/
Facilities
/
Capabilities
/
Quality Assurance
/
Programs
/
News
/
Picture Gallery
/
Announcements
/
Contact Us
Home
/
Add to Favourites
/
Site Map
/
Türkçe